Persimmon Homes Norwich Headquarters

Persimmon HQ fit out

The job

Internal fit out for Persimmon Homes’ newly built three-storey head office in Norwich, Norfolk.

What we did

Dry liningglazed partitionsceilings – raised access floors – plastering of walls

The detail

Dry lining: Dot and dab method.

Glazed offices: Komfort Komfire 75 demountable partitioning finished in white aluminium.

Glazed meeting rooms: Komfort Polar Double Glazed frameless partitioning and full height glass doors.

Ground floor entrance: Komfort Polar Single Glazed frameless partitioning with full height hospital door set.

Wall finishes: Thistle Multi Finish skim coat.

Ceilings: Armstrong 600mm x 600mm Perla Tegular tile laid within a 24mm grid system suspended from underside of the concrete soffit.

Top floor ceilings: MF ceiling installation, skim coat finished.

Floors: Kingspan Raised Access Floor system with medium duty 600 x 600 steel encased panels on adjustable pedestals bonded to the sub-floor.

Thurlow Nunn in Great Yarmouth