The job
Working for NRS on the three storey rebuild of the Anglia One Offshore Wind Farm Control Centre in Lowestoft.
What we did
Dry lining – taping and jointing – plastering – acoustic ceiling – fire stopping – feature timber acoustic wall on 2nd floor
The detail
Dry lining: BG MF metal system and Quattro 41 acoustic plasterboard install with tape and joint finish. Decorative feature plasterboard wall in atrium, using QIC recessed profile aluminium trim.
Ceilings: Timber slat acoustic ceilings in entrance/reception.